This deck extended the previous deck footprint further left and into the rear yard. Stairs were also added leading directly to the rear grade.
Brown PT. 2 x 6 decking has been installed with 1 row of picture framing (single board border) and a spline near the stairs. The railing system was updated from cantilevered wood balusters to metal pickets with wooden posts and rails. The piers were constructed with belled out concrete footings and 6×6 wood posts, replacing the old 4×4 wood posts.
![Delayne Drive Deck - After Construction Front Right View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-Front-Right-View.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - Before Construction Front Right View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-Before-Construction-Front-Right-View.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - Before Construction Front View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-Before-Construction-Front-View.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - Before Construction Left Side View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-Before-Construction-Left-Side-View.jpg?resize=762%2C1024&ssl=1)
![Delayne Drive Deck - Before Construction Right Side View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-Before-Construction-Right-Side-View.jpg?resize=768%2C1024&ssl=1)
![Delayne Drive Deck - Before Construction Under the Deck](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-Before-Construction-Under-the-Deck.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - After Construction Front View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-Front-View.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - After Construction View From Deck Left](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-View-From-Deck-Left.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - After Construction View From Deck Right](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-View-From-Deck-Right.jpg?resize=1024%2C768&ssl=1)
![Delayne Drive Deck - After Construction Stair Landing](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-Stair-Landing.jpg?resize=1024%2C764&ssl=1)
![Delayne Drive Deck - After Construction Stairs](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-Stairs.jpg?resize=1024%2C751&ssl=1)
![Delayne Drive Deck - After Construction Stairs Looking Up](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/02/Delayne-Drive-Deck-After-Construction-Stairs-Looking-Up.jpg?resize=768%2C1024&ssl=1)