This 192 sq. ft. deck replaces a wood framed landing for side entry into the house. The deck increased from 5′-0″ x 4′-6″ to 16′-0″ x 12′-0″, providing ample room for a BBQ and lounge area. The stairs were constructed to face North, rather than the previous direction of South, to cut down on travel time.
Brown PT. 2 x 6 decking has been installed with 1 row of picture framing (single board border). Internal butt joints were avoided on this deck. The railing system was updated from cantilevered wood balusters to metal pickets with wooden posts and rails. The piers were constructed with belled out concrete footings and 6×6 wood posts, replacing the old 4×4 wood posts.
![Angus Deck - After Construction Front Right View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-After-Construction-Front-Right-View.jpg?resize=1024%2C768&ssl=1)
![Angus Deck - Before Construction Front Right View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-Before-Construction-Front-Right-View.jpg?resize=1024%2C753&ssl=1)
![Angus Deck - Before Construction Front View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-Before-Construction-Front-View.jpg?resize=1024%2C770&ssl=1)
![Angus Deck - Before Construction Front Left View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-Before-Construction-Front-Left-View.jpg?resize=1024%2C902&ssl=1)
![Angus Deck - Before Construction Left View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-Before-Construction-Left-View.jpg?resize=768%2C1024&ssl=1)
![Angus Deck - Before Construction Right View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-Before-Construction-Right-View.jpg?resize=768%2C1024&ssl=1)
![Angus Deck - During Construction Joist Tape](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-During-Construction-Joist-Tape.jpg?resize=1024%2C746&ssl=1)
![Angus Deck - After Construction Front Left View](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-After-Construction-Front-Left-View.jpg?resize=1024%2C758&ssl=1)
![Angus Deck - After Construction Stairs](https://i0.wp.com/broeredesign.com/wp-content/uploads/2020/02/Angus-Deck-After-Construction-Stairs-Cover.jpg?resize=750%2C1024&ssl=1)
![Angus Deck - After Construction Post Base Detail](https://i0.wp.com/broeredesign.com/wp-content/uploads/2018/03/Angus-Deck-After-Construction-Post-Base-Detail.jpg?resize=1024%2C756&ssl=1)