Uxbridge Deck - After Construction Stair Gate

This project involved the tear down of the existing deck. The replacement deck shared the same footprint but featured a few changes.

A new set of stairs complete with gate coming off an angled corner was added and an interior railing was provided to separate the deck areas. This was desired to keep the owner’s dogs contained. Additionally, the original wooden pickets were replaced with a wood and aluminum baluster system. The decking changes directions at a spine location which lines up perpendicularly with a set of stairs.

Leave a Reply

Your email address will not be published. Required fields are marked *